摘要 |
PURPOSE: A method for constructing elastic pavement materials is provided to prevent people from becoming injured when falling down on a floor as the elastic pavement materials are made of primer, SBR chips, mixed aggregate, and binder. CONSTITUTION: A method for constructing elastic pavement materials is as follows. An unerlayer is even, and foreign materials are removed(S100). The underlayer is dried, and a standard line is marked using a tape or a board(S110). Primer is evenly spread on the underlayer using a roller or an air spray(s120). S The composition of an elastic layer is formed by mixing SBR chips or EPDM chip with aggregate and binder(S130). The composition of the elastic layer is paved by the primer underlayer, and pressed with constant pressure by the roller(S140). Surface finishing materials are spread on the composition of the elastic layer(S150). The composition of the elastic layer is cured for 24~48 hours (S160). |