发明名称 Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
摘要 A construction method for a girder in a bridge in which a plurality of piers are installed in an interval in a longitudinal direction of the bridge, a plurality of copings are installed on the piers, and a plurality of girders respectively installed between the piers are installed on the copings. The method comprises the steps of: installing at least one temporary girder on a front coping of the copings and a rear coping adjacent to the rear coping of the copings; installing a crane for pulling up a girder having a girder pulling up space therein guided by the temporary girder; and providing with a girder by a pre-cast method so as to install a girder on the front coping and the rear coping.
申请公布号 US8166596(B2) 申请公布日期 2012.05.01
申请号 US20080133974 申请日期 2008.06.05
申请人 KANG DONG-OK;YOON MAN-GEUN;SHIN HYUN-YANG;KIM YEONG-SEON;SAMSUNG CORPORATION 发明人 KANG DONG-OK;YOON MAN-GEUN;SHIN HYUN-YANG;KIM YEONG-SEON
分类号 E01D21/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址