发明名称 METHOD OF VERTICAL MINE BACKFILLING
摘要 FIELD: mining. ^ SUBSTANCE: method includes layer filling of a mine with a backfilling material. The backfilling layer in the form of a cylindrical concrete block is previously made on the surface in an autoclave chamber. Concrete blocks are made with a cylindrical groove, at the same time the upper and lower surfaces are arranged as truncated. Installation of cylindrical concrete blocks in the shaft is carried out onto a hydraulic insulation putty. A gap between mine walls and blocks is solidified with a shrinkage-free water-resistant hardening concrete mix. ^ EFFECT: development of a water-resistant and shrinkage-free backfilling massif in a vertical mine to the moment of its backfilling completion. ^ 2 cl, 3 dwg
申请公布号 RU2449129(C1) 申请公布日期 2012.04.27
申请号 RU20100145577 申请日期 2010.11.09
申请人 FEDERAL'NOE GOSUDARSTVENNOE BJUDZHETNOE OBRAZOVATEL'NOE UCHREZHDENIE VYSSHEGO PROFESSIONAL'NOGO OBRAZOVANIJA "KUZBASSKIJ GOSUDARSTVENNYJ TEKHNICHESKIJ UNIVERSITET IMENI T.F. GORBACHEVA" (KUZGTU) 发明人 ISAENKO ALEKSEJ VLADIMIROVICH;UGLJANITSA ANDREJ VLADIMIROVICH;KHMELENKO TAT'JANA VLADIMIROVNA;GLADKIKH LJUDMILA NIKOLAEVNA
分类号 E21F15/00 主分类号 E21F15/00
代理机构 代理人
主权项
地址