摘要 |
PURPOSE: A synthetic cast-in-place pile and a construction method thereof are provided to satisfy the intensity of a pile and to minimize the volume of the pile without a reinforcing steel bar. CONSTITUTION: A synthetic cast-in-place pile comprises a casing(10) and a filler(20). The casing is inserted in a pile hole which is formed in underground. The filler is piled in field inside casing. The casing comprises a casing main body(11), a first reinforcing rib(12), a second reinforcing rib(13), and multiple filling holes(12a,13a). A hollow is formed inside of the casing main body. The first reinforcing rib is formed in the inner circumference of the casing main body in a vertical direction and is separated between the reciprocity according to the columnar direction at a regular interval. The filling hole is respectively formed on the first reinforcing rib and the second reinforcing rib. |