发明名称 SEMI-HINGE RAHMAN BRIDGE AND METHOD FOR CONSTRUCTING THE SAME
摘要 PURPOSE: A semi-hinge rahmen bridge and a construction method thereof are provided to minimize the size of a foundation without an additional overturning prevention device. CONSTITUTION: A semi-hinge rahmen bridge comprises foundations(1), walls(2), joint units, connection steels, an upper beam, and coating concrete(8). The foundations are vertically positioned at the ground. The walls are installed on the foundations. The joint units are arranged between the walls and the foundations and resist the overturn of the walls. The connection steels are installed on the top of the walls. The upper beam is connected to the connection steels. The coating concrete is placed in order to coat the upper beam and the connection steels.
申请公布号 KR101007708(B1) 申请公布日期 2011.01.13
申请号 KR20100061425 申请日期 2010.06.28
申请人 PSI TECHNOLOGY 发明人 CHEON, JIN UK;SEO, DONG YOUNG;MOON, YONG HYUN
分类号 E01D21/00;E01D2/00 主分类号 E01D21/00
代理机构 代理人
主权项
地址