发明名称 METHOD OF PLANNING OPERATION SCHEDULE, OPERATION SCHEDULE PLANNING SYSTEM, AND OPERATION SCHEDULE PLANNING PROGRAM IN REPROCESSING PLANT
摘要 <p><P>PROBLEM TO BE SOLVED: To provide a method of planning an operation schedule of a reprocessing plant that grasps processing situations of respective facilities, satisfies regulations of nuclear limitations, such as safeguards, criticality prevention, and the amount of emission of radioactive waste, and considers an earning rate and simplification of an approval act, and to provide an operation schedule planning system and an operation schedule planning program. <P>SOLUTION: The method of planning an operation schedule includes: a selection process for selecting fuel for performing shearing processing from fuel storage facilities; a calculation process for calculating the order of fuel processing of the extracted fuel; a process for determining the calculated order of fuel processing; a calculation process for calculating operation data including amount of production in respective facilities of a reprocessing process, a processing period, and the amount of occurrence of waste, based on the determined order of fuel processing; a process for planning operation schedules of the respective facilities; a process for approving the planned operation schedule; and a process for displaying the operation schedule. <P>COPYRIGHT: (C)2011,JPO&INPIT</p>
申请公布号 JP2010266232(A) 申请公布日期 2010.11.25
申请号 JP20090115632 申请日期 2009.05.12
申请人 TOSHIBA CORP 发明人 SUZUKI YOSHIAKI
分类号 G21C19/42;G06Q50/00;G06Q50/26;G21C19/40 主分类号 G21C19/42
代理机构 代理人
主权项
地址