发明名称 METHOD AND IMPLEMENT FOR CONSTRUCTING PILE
摘要 PROBLEM TO BE SOLVED: To provide a method for constructing a pile, and a pile construction implement for use in the method, which enable a pile jacking force, necessary for pile penetration work performed by a rotary pile-jacking method, to be obtained without causing a drastic increase in a construction cost. SOLUTION: A cylindrical implement body 31, which has a spiral blade 33 fixed along an outer periphery, is attached to the pile 1 jacked into the ground 7, in such a manner to be rotated and jacked integrally with the pile 1. Subsequently, the implement body 31 is rotated together with the blade 33 in the ground 7, so that a downward propulsive force can be obtained with the blade 33; and the pile 1 and implement body 31 are jacked into the ground 7. After that, the implement body 31 is detached from the pile 1, and removed from the ground 7. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2010242405(A) 申请公布日期 2010.10.28
申请号 JP20090093130 申请日期 2009.04.07
申请人 NIPPON STEEL CORP 发明人 ISHIHAMA YOSHIRO;TAKAGI MASATAKA;HIRATA TAKASHI
分类号 E02D13/10;E02D5/28;E02D7/22;E02D9/02 主分类号 E02D13/10
代理机构 代理人
主权项
地址