发明名称 CONSTRUCTION METHOD FOR RATIONALLY ARRANGING SHEET PILE
摘要 PROBLEM TO BE SOLVED: To provide a construction method for rationally arranging a sheet pile, which can reduce the used amount of sheet pile and achieve a reduction in construction cost, by arranging the optimum sheet pile coping with the depth-direction stress and deformation of a wall body, in the construction of the earth retaining wall. SOLUTION: In this method for constructing the sheet pile, the earth retaining wall is constructed by driving the sheet piles in a horizontally continuous manner into the ground. When the sheet piles are driven into the ground, the sheet piles, which have an embedment depth below an excavation bottom set great, are installed in such a manner as to be mixed with the sheet piles which have the embedment depth set shallow, or to be mixed with the sheet piles different in cross-sectional shape, depending on the depth-direction stress and deformation of the earth retaining wall and ground conditions. COPYRIGHT: (C)2011,JPO&INPIT
申请公布号 JP2010222818(A) 申请公布日期 2010.10.07
申请号 JP20090070357 申请日期 2009.03.23
申请人 ASANUMA CORP;YUTAKA KAIHATSU KK 发明人 YOSHIKAWA TOSHIAKI;UCHII EIJI;SHIMOYAMA NAOKI;YOSHIDA YORINORI
分类号 E02D5/04;E02D7/20 主分类号 E02D5/04
代理机构 代理人
主权项
地址