发明名称 TIME SYNCHRONIZATION IN HYDROCARBON EXPLORATION UNITS AT DIFFERENT LOCATIONS
摘要 <p>To synchronize units of a formation evaluation/drilling operation evaluation system, a time delay associated with a communications link between a master unit (100) and a slave unit (102) of the formation evaluation/drilling operation evaluation system is determined. The master unit (100) has a master time clock (110) that provides universal time. The time delay associated with the communications link is used to enable synchronization of time provided by a slave time clock (112) in the slave unit (102) to the universal time.</p>
申请公布号 WO2009105311(A1) 申请公布日期 2009.08.27
申请号 WO2009US32204 申请日期 2009.01.28
申请人 SCHLUMBERGER CANADA LIMITED;SCHLUMBERGER TECHNOLOGY B.V.;PRAD RESEARCH AND DEVELOPMENT LIMITED;SERVICES PETROLIERS SCHLUMBERGER;SCHLUMBERGER HOLDINGS LIMITED;NICHOLS, EDWARD;HOSODA, YUJI;JOHNSEN, THOR;VYTLA, VAMSI;ZHANG, HONG;DEPAVIA, LUIS 发明人 NICHOLS, EDWARD;HOSODA, YUJI;JOHNSEN, THOR;VYTLA, VAMSI;ZHANG, HONG;DEPAVIA, LUIS
分类号 G01V1/40 主分类号 G01V1/40
代理机构 代理人
主权项
地址