摘要 |
PROBLEM TO BE SOLVED: To reduce construction costs in which a period of time necessary for completion of framework is shortened to a period substantially equal to that required in a framework construction method, while taking advantage of a framework wall construction method. SOLUTION: According to the method, skeletal structure is set up like a framework by using columns 11, 12, girders 2, and beams 3 necessary for erection of the framework, and after the completion of the framework, a roof is placed, followed by fitting an erect wall 6, as a framework wall, into an opening section O enclosed by the columns 11, 12, (or 12, 12), the girders 2, etc. COPYRIGHT: (C)2009,JPO&INPIT
|