发明名称 Method of building a railway on a concrete slab and temporary tie plate for carrying out said method
摘要 Rails (2) pre-mounted on their tie plates (11) are suspended above the location at which a concrete slab is to be poured. The position of the rails is then adjusted to move the bottom plate of temporary tie plates, disposed under the base of each tie plate, accurately to the location at which the tie plates must rest. Concrete slab is then poured up to the height of the temporary tie plates. <??>The rails are raised, after which the temporary tie plates are removed. The rails are then positioned on the slab, with the tie plates fixed to the corresponding anchor members. An Independent claim is also included for a temporary tie plate.
申请公布号 HK1057772(A1) 申请公布日期 2008.08.29
申请号 HK20030108332 申请日期 2003.11.14
申请人 ALSTOM 发明人 RADA NICOLAS
分类号 E01B;E01B9/44;E01B1/00;E01B9/02;E01B9/40;E01B29/00;E01B37/00 主分类号 E01B
代理机构 代理人
主权项
地址