摘要 |
A method for constructing a reinforced earth retaining wall of a cut slope is provided to enable construction of geogrid by controlling length with a turn buckle. A method for constructing a reinforced earth retaining wall of a cut slope includes the steps of: installing a plurality of fixing members(10) on the cut slope, fastening an installation member at the top of the fixing member exposed out of the cut slope, and connecting the installation member with a connection steel rod; digging the bottom of the cut slope and installing foundation aggregates thereon; piling retaining wall blocks(30) with holes on the foundation aggregates, and inserting steel rods in the hole of retaining wall blocks at every second or third rows; and connecting one part of a reinforcement(50) with the steel rod by a V shaped reinforcement connection ring, connecting the other part of the reinforcement with a turn buckle by the V shaped reinforcement connection ring, and inserting the turn buckle to the connection steel rod, and installing the reinforcement upwards at 5~10°. |