摘要 |
Method for performing drill-blast operations at pits includes drilling of rows of vertical technological wells, with charging those, blasting, formation of contour surface of slant, formation of lower ledge, drilling at newly formed lower ledge inclined wells, with formation of slant contour surface.
|