发明名称 ESTIMATING WORK SUPPORT SYSTEM, ESTIMATING WORK SUPPORT DEVICE AND ESTIMATING WORK SUPPORT METHOD
摘要 PROBLEM TO BE SOLVED: To provide an estimating work support system capable of comparatively easily estimating an indirect cost in software development, and an estimating work support device and an estimating work support method. SOLUTION: A development cost of software is divided into items of a direct cost and an indirect cost. Basic information used as the calculation reference of the direct cost, and estimation reference data of the indirect cost calculated based on the basic information, are stored in a database, and development information of the software to be developed is input from an input means. An estimation processing means is provided for comparing the basic information from the database with the input development information and correcting the estimation reference data of the indirect cost based on the compared result to compute the indirect cost of the software to be developed. The estimated result is displayed on a display means. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007011697(A) 申请公布日期 2007.01.18
申请号 JP20050191918 申请日期 2005.06.30
申请人 TOSHIBA CORP 发明人 JIN KATSUMASA
分类号 G06F9/44 主分类号 G06F9/44
代理机构 代理人
主权项
地址