发明名称 METHOD OF REINFORCING A HOLLOW PART WHICH IS FORMED IN AN EARTH AND SAND GROUND AT A REAR SIDE OF RETAINING WALL
摘要 <p>A method of reinforcing a hollow part which is formed in an earth and sand ground at a rear side of retaining wall by a revetment work is disclosed. The method of reinforcing a hollow part which is formed in an earth and sand ground at a rear side of retaining wall by a revetment work, the method including: forming a base hole by excavating the earth and sand ground facing to a base bottom surface of the retaining wall by a predetermined depth; forming a support wall by foaming first hard urethane at an inlet of the hollow part formed by the base bottom surface of the retaining wall and lost earth and sand and forming a underwater wall by foaming second hard urethane between the base hole, the support wall, and the base bottom surface of the retaining wall; forming a reinforcing layer by foaming third hard urethane at a upper part of a bottom surface of the hollow part, a upper part of the support wall, and a upper part of a bottom plate of the retaining wall; forming a urethane and crushed stone layer by using alternatively crushed stones and fourth hard urethane at a upper part of the reinforcing layer; and forming an impact relieving layer by using fifth hard urethane between a road formed at a upper part of the hollow part and the urethane and crushed stone layer. Therefore, it is possible to semi-permanently reinforce a hollow part which is formed in an earth and sand ground at a rear side of retaining wall within a short work period.</p>
申请公布号 WO2006088309(A1) 申请公布日期 2006.08.24
申请号 WO2006KR00523 申请日期 2006.02.15
申请人 CHOI, KYEONG SIK;IN CO, LTD;CHOI, JEONG HUN 发明人 CHOI, JEONG HUN;CHOI, KYEONG SIK
分类号 E02D29/02;E02D17/18 主分类号 E02D29/02
代理机构 代理人
主权项
地址