摘要 |
<p><P>PROBLEM TO BE SOLVED: To improve assembly work efficiency by pushing and sliding a flange of an electric connection box on the sliding wall of a casing, and then, inserting the flange into an insertion groove. <P>SOLUTION: The flanges 20L and 20R can be inserted into the insertion grooves 26 by pushing and sliding the flanges 20L and 20R of the electric connection box 1 on the sliding wall 31 of the casing 23. Hereby, the flanges 20L and 20R can be positioned easily in the insertion grooves 26 in assembling, so that the erroneous insertion, etc. of the flanges 20L and 20R can be prevented, and work efficiency in assembling is improved. Moreover, since tips of a pair of engaging pieces 36A and 36B face each other at the same sides, the electric connection box 1 is not positioned on both sides (back and forth) in thickness directions of the flanges 20L and 20R, between lock parts 33L and 33R and between locked parts 34L and 34R. Accordingly, the double positioning of the electric connection box 1 can be avoided, so that the work efficiency in assembling can be prevented from deteriorating resulting from an error in molding or an error in assembling. <P>COPYRIGHT: (C)2006,JPO&NCIPI</p> |