发明名称 System and method(s) of blended mine planning, desing and processing.
摘要 The present invention relates to the field of extracting resource(s) from a particular location. In particular, the present invention relates to the planning, design and processing related to a mine location in a manner based on enhancing the extraction of material considered of value, relative to the effort and/or time in extracting that material. The present application discloses, amongst other things, a method of and apparatus for determining the removal of material(s) from a location, determining the removal of material(s) of a differing relative value from a location, determining a schedule corresponding to a risk and/or return basis, determining aggregated block ordering for the extraction of material from a location, determining a schedule for extraction of dumps and determining a mine design.
申请公布号 ZA200502771(B) 申请公布日期 2006.06.28
申请号 ZA20050002771 申请日期 2005.04.06
申请人 BHP BILLITON INNOVATION PTY LTD. 发明人 FROYLAND, GARY, A.;MERAB MENABDE
分类号 E21C;E21C41/26 主分类号 E21C
代理机构 代理人
主权项
地址