发明名称 |
TUNNEL CONSTRUCTION METHOD |
摘要 |
PROBLEM TO BE SOLVED: To provide a tunnel construction method for constructing an approach section ranging from a ground without the need for constructing a shaft. SOLUTION: The tunnel construction method comprises a start section construction step of constructing a start section where a shield machine 1 starts, an approach section initial construction step of using a heavy machine 3 for drilling the ground on the upper side of the ceiling of the shield machine 1 which digs obliquely downward from the start section and of installing a segment 4 with its sectionally rectangular upper part opened in a range up to a preset depth and installing a sectionally rectangular segment 4 in a range deeper than the preset depth, and an approach section following construction step of constructing the lower stage of the approach section 6 extending from the approach section 6 constructed in the approach section initial construction step, constructing the upper stage thereof in a range up to the preset depth while using the shield machine 1 with its ceiling being opened for advancing along the segment 4 provided on the lower stage, and constructing the upper stage thereof in a range deeper than the preset depth while using the shield machine 1 with its opening portion closed for advancing. COPYRIGHT: (C)2005,JPO&NCIPI
|
申请公布号 |
JP2005105695(A) |
申请公布日期 |
2005.04.21 |
申请号 |
JP20030341138 |
申请日期 |
2003.09.30 |
申请人 |
TAISEI CORP;ISHIKAWAJIMA HARIMA HEAVY IND CO LTD;ISHIKAWAJIMA CONSTR MATERIALS CO LTD |
发明人 |
KANEKO KENICHI;OTA MITSUHIKO;YUGUCHI MASAKI;OHATA YUTAKA;UEDA KENRO;KADOTA KATSUMI;SUGIMORI MAKOTO;OZAKI MASAYA;HASHIMOTO HIROHIDE;WAKABAYASHI MASANORI |
分类号 |
E21D9/02;E02D29/05;E21D9/06;E21D9/087;E21D11/08;(IPC1-7):E21D9/087 |
主分类号 |
E21D9/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|