发明名称 RECLAMATION METHOD USING FLOATING PIER
摘要 PROBLEM TO BE SOLVED: To provide a reclamation method using a floating pier, which can shorten the length of bridging facilities by changing a manner of a conventional reclamation method using the floating pier, to thereby largely contribute to shortening of a construction period and reduction in construction cost. SOLUTION: According to the reclamation method, an arched bridging pier 10 is constructed in a boundary area between an existing bank E1 extended from an existing reclaimed land and a reclamation water zone A, by using steel sheet piles and land-fill materials, and a mobile bridge 4 reaching the floating pier 2 is extended from the bridging pier 10. To reclaim the reclamation water zone, while the floating pier 2 is rotated by every predetermined angle about the bridging pier 10 as the center, vehicles are advanced from the existing bank E1 via the bridging pier 10 to the floating pier 2 to throw the land-fill materials directly into water, and the floating pier 2 is moved in parallel, i.e., the conventional method of reclamation can be employed to form a sectorial bank E2' covering a bank E2. COPYRIGHT: (C)2005,JPO&NCIPI
申请公布号 JP2004353381(A) 申请公布日期 2004.12.16
申请号 JP20030154356 申请日期 2003.05.30
申请人 TOYO CONSTR CO LTD 发明人 KATSURAGAWA TETSUYUKI;MASAYASU SEIZO;UENISHI HIROAKI
分类号 E02B3/18;E01D15/14;E01D15/24;(IPC1-7):E02B3/18 主分类号 E02B3/18
代理机构 代理人
主权项
地址