发明名称 |
PRODUCTIVITY KNOWLEDGE CONSTRUCTION METHOD, SOFTWARE DEVELOPMENT MAN-HOUR TARGET DETERMINATION METHOD, AND PROGRAM FOR EXECUTING METHOD |
摘要 |
<P>PROBLEM TO BE SOLVED: To promote development process improvement activity by improving the man-hour estimation accuracy of a software development project (PJ) and facilitating the formation of an agreement with a development site when determining a productivity (man-hour) target. <P>SOLUTION: A plurality of high-quality and high-productivity model PJs are extracted, and a basic (averaged) productivity model f<SB>0</SB>(x) and variation of the extracted PJs (magnitude of a productivity gap to f<SB>0</SB>(x)) are found on the basis of past results productivity data thereof (S102). An experienced person performs factor analysis of the variation of the model PJ to obtain a factor and its weight as PJ characteristics (S103). Productivity knowledge (a standard productivity model f<SB>1</SB>(x)×a PJ characteristic coefficient c) is determined on the basis of the PJ characteristics and the magnitude of the productivity gap. When estimating the development man-hour target, productivity of the whole development organization is improved by adjustment of the standard productivity model f<SB>1</SB>(x), and cost management is enabled by adjustment of the PJ characteristic coefficient of the target PJ. <P>COPYRIGHT: (C)2005,JPO&NCIPI |
申请公布号 |
JP2004334321(A) |
申请公布日期 |
2004.11.25 |
申请号 |
JP20030125732 |
申请日期 |
2003.04.30 |
申请人 |
RICOH CO LTD |
发明人 |
MATSUSE KENJI;ISHII TOMOYUKI;OISHI NORIKAZU;UEHARA MANABU |
分类号 |
G06Q10/06;G06F9/44;G06Q10/00;G06Q50/00;G06Q50/10 |
主分类号 |
G06Q10/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|