摘要 |
PROBLEM TO BE SOLVED: To provide a temporarily locking device for a pipe support band in which a lock claw of the temporarily locking device can be easily introduced to an installation piece part of the pipe support band. SOLUTION: In this temporarily locking device 5 for the pipe support band, a leg member fixed to a building is held by a pair of the installation piece parts of two-split band bodies holding a pipe, and one or more through holes are respectively opened in the installation piece parts and the leg member for a shaft part of a bolt to be inserted, so that the installation piece parts are fixed to the leg member by a bolt and a nut. It is composed of an installation base 50 to be set on one surface of one installation piece part, bolt locking holes 51 and 51 formed at corresponding positions to the through holes as the installation base 50 is set, and a pair of an upper and a lower piece parts 52 and 52 extended from an upper end and a lower end of the installation base 50 in a roughly perpendicular direction, and provided with locking claws 52a and 52 to be locked to the installation piece part. Installation piece part guide parts 57 and 57 are formed on the tips of the upper and the lower piece parts 52 and 52 to be bent to open from each other. COPYRIGHT: (C)2004,JPO&NCIPI
|