摘要 |
A landing stage for an offshore wind power installation is provided. The landing stage includes both a mooring location for ships and a landing area for helicopters. A comm on route links the mooring location and the landing area to the installation. The landing stage may have a foundation separate from the foundation of the installation and supported on the seabed or floating in the sea. Logistical and infrastructural equipment may be located at the landing stage and accessible to both the mooring location and the landing stage, such as supply buildings, storage areas and navigational aids. In one embodiment, the landing stage is located on the le e side of the installation in relation to the prevailing direction of the wind at the installation site. A wind power installation including the landing stage is also described. The invention ma y also be used at shore installations. |