摘要 |
FIELD: production of construction materials; semifinished slag (concrete) blocks stowage for drying. SUBSTANCE: the invention presents a method of the semifinished slag (concrete) blocks stowage for drying. Technical result - provision of continuity of the process of the semi-finished slag (concrete) blocks molding and stowaging for drying. The method of stowage of semi-finished slag (concrete) blocks for drying provides for stowage of manufactured out of a semi-hard mixture by the technology of vibromolding of the fresh-molded semi-finished slag (concrete) blocks on transport drain pallets for their moving to a drying room. The slag (concrete) blocks are laid in turn in one row on the transport pallets of trolleys of the continuous rail conveyor. The following rows of the slag (concrete) blocks are laid on the first rows in a bonding way till shaping stacks. The upper sides of the early laid slag (concrete) blocks are exposed to the moisture-proof treatment. Duration of the conveyor trolleys turn-over cycle depends on conditions of the slag (concrete) blocks of the previous rows gaining the compression strength of no less than 0.04 kgf / cm sq. EFFECT: the invention allows to provide continuity of the process of the semifinished slag (concrete) blocks molding and stowaging for drying. 1 dwg |