摘要 |
PROBLEM TO BE SOLVED: To provide an asphalt reserve facility 1 from which a desired amount of asphalt lump can be easily taken out when the reserved asphalt is taken out. SOLUTION: In the asphalt reserve facility 1 to reserve asphalt in layers, an intermediate layer 3 is interposed between asphalt layers 2 so that the asphalt layers 2 adjacent to each other are not brought into contact with each other, and the asphalt layers 2 are separable from each other. In addition, the intermediate layer 3 is formed of stone powder in the asphalt reserve facility 1. COPYRIGHT: (C)2003,JPO
|