发明名称 VERFAHREN UND KOMBIKRAFTWERK ZUR THERMISCHEN LEISTUNGSERHÖHUNG
摘要 The power generation plant has a gas turbine (2) and a steam generator (3), with the exhaust gases from the gas turbine fed to the steam generator as the combustion air. Part of the gas turbine exhaust gas is fed to a heating vessel (7) via a branch line (6) leading from the exhaust gas line (1), for removal of the waste heat for driving a further turbine generator, before mixing the cooled exhaust gas provided by the heating vessel with the gas turbine exhaust gas fed to the steam generator.
申请公布号 ATA201594(A) 申请公布日期 2003.03.15
申请号 AT19940002015 申请日期 1994.10.28
申请人 AE ENERGIETECHNIK GMBH 发明人 VALE WERNER
分类号 F01K23/10;(IPC1-7):F02C6/00 主分类号 F01K23/10
代理机构 代理人