发明名称 CONSTRUCTION SCHEDULE AND TABLE SYSTEM
摘要 PROBLEM TO BE SOLVED: To provide a construction schedule which is simplified, facilitates display of the entire schedule of construction, especially of finishing construction, is easily viewable, easily understandable in terms of the entire construction, provides a large flexibility in the constructor, and enables smooth progress of the construction. SOLUTION: According to the construction schedule, a number of cells 4 are determined by a plurality of rows 2 and columns 4, and the rows and columns represent construction sections 20 and working schedules 30, respectively. The construction sections are classified into construction section groups 21, each consisting of a plurality of houses, and the working schedules are classified into schedule units 31 each consisting of a plurality of substantial work days. Then, types of work are collected to form a work group which is then simple-encoded as character information 41 and are displayed in the cell 4. The details of the work corresponding to the simple-encoded character information 41 are displayed in a work detail table 5.
申请公布号 JP2002303044(A) 申请公布日期 2002.10.18
申请号 JP20010107499 申请日期 2001.04.05
申请人 MITSUI CONSTR CO LTD 发明人 ABE FUMIO;IWANO HIDEYUKI
分类号 E04G21/00;G06Q10/00;G06Q10/06;G06Q50/00;G06Q50/08 主分类号 E04G21/00
代理机构 代理人
主权项
地址