发明名称 FLOOR STRUCTURE AND FLOOR WORK EXECUTION METHOD
摘要 PROBLEM TO BE SOLVED: To improve construction efficiency and quality by providing a horizontal member with a plate member wider than that, which is fixed thereto, and laying a wood large-section long material on the plate member and fixing the same. SOLUTION: A wood plate member 3 is fixed to the upper surface of a horizontal member 2 in a wooden building frame by nails 4 or the like, a square timber large- section long material 1 is laid on the upper surface of the plate 3, and the long material 1 is fixed from the lower surface of the plate 3 by nails 4 or the like. Secondly, tongues are provided on mutual adjacent surfaces if desired, and after the plate member 3 is fixed on the horizontal member 2, with the tongues suitably stored rather closely, the long material 1 is temporarily placed up to the end of the floor surface. After the gap between the mutual adjacent parts of the long material 1 is substantially equally expanded, the long material 1 is fixed to the plate 3. Subsequently, a gap is provided on a header side of the long material 1 to be loaded with gap filling member. Thus, nails can be easily driven, torsion of a large-section long material, which is probably caused with the passage of time can be restrained, and deformation due to expansion and shrinkage caused in the lower surface of the large-section long material can be restrained so as to hardly cause play of the floor.
申请公布号 JP2001020505(A) 申请公布日期 2001.01.23
申请号 JP19990195673 申请日期 1999.07.09
申请人 ASAHI CHEM IND CO LTD 发明人 KUDO TOMOO
分类号 E04B5/02;E04F15/02;E04F15/04;(IPC1-7):E04F15/02 主分类号 E04B5/02
代理机构 代理人
主权项
地址