发明名称
摘要 PROBLEM TO BE SOLVED: To reduce weight of an upper structure, restrain shear fracture, secure high tenacity performance, and eliminate an underground beam by fixing a concrete-filled steel pipe column to a synthetic steel pipe pile integrally formed on a cast-in-place pile, and installing a girder having a hollow cross section or an opening cross section. SOLUTION: A lower part of a concrete-filled steel pipe column (CFT column) 3 of a railway elevated bridge is fixed to a synthetic steel pipe pile 2 integrally formed in an upper part of a cast-in-place pile 1. A reinforce concrete girder (a hollow girder) 4 having a hollow cross section or an opening close section as a vertical girder member is installed between concrete-filled steel pipe columns 3, 3 adjacent in the bridge shaft direction. A reinforced concrete girder 5 as a horizontal girder member is arranged between the concrete-filled steel pipe columns 3, 3 adjacent in the right-angled direction to the bridge girder direction to be connected to the reinforced concrete girder 4. Thus, earthquake resistant performance to a large-scale earthquake can be secured, a bridge shaft directional span interval L can be set long, and since an underground beam can be eliminated, a construction period is shortened, a construction cost can be reduced, just above elevating work can be realized, and an elevation under space can be effectively used.
申请公布号 JP3081833(B1) 申请公布日期 2000.08.28
申请号 JP19990071599 申请日期 1999.03.17
申请人 发明人
分类号 E01D1/00;E01D2/00;E01D101/24;E01D101/26;E01D101/30;(IPC1-7):E01D2/00 主分类号 E01D1/00
代理机构 代理人
主权项
地址