摘要 |
FIELD: formation of panel-type constructions. SUBSTANCE: method includes the following operations: laying out of layer and group of layers of prepreg on stacking table, transfer of laid out layer or group of layers on molding rigging, drain system laying, packing of laid out stack of prepreg in sealed casing, evacuation and heating up to preset value of temperature. In this case, at least one layer of fibrous filler unimpregnated with resin is placed between prepreg layers with allowed stock relative to stack of prepreg layers. Allowed stock is coupled to vacuum system through drain system. EFFECT: complete removal of air admixtures from prepreg stack, formation of poreless structure. 1 tbl, 2 expe
|