<p>PROBLEM TO BE SOLVED: To significantly reduce time and labor needed for pipeline installation by improving pipeline and support installation position accuracy and simplifying and standardizing the installation procedure. SOLUTION: Things (common pipeline support 5, temporary materials, etc.) which can be used as a reference indicator for pipeline installation are arranged prior to pipeline installation work, by installing a pipeline installation position regulating jig 6 which can adjust the position of a pipeline 8 in the horizontal and vertical directions to the reference indicator 5, positioning is made for the installation of the pipeline 8. Using a relative location dimension difference between the reference indicator 5 and the pipeline 8, a support 14 intrinsic to the pipeline is mounted. After the pipeline 8 corresponding to the pipeline support 14 is mounted, the pipeline mounting position adjusting jig is removed.</p> |