发明名称 BRIDGE RAIL USING BUOYANCY
摘要 The present invention relates to a bridge rail using buoyancy, to automatically be laid down on an elevation of a water level and to automatically be held up on a normal water level, having a very simple structure and low manufacturing costs. According to the present invention, the bridge rail using buoyancy (1000) comprises: a bracket fixated on a bridge structure, a pair of posts, a guide rail, a hinge means, a buoyancy means, and a restoration means. The bracket (1100) comprises: a plate shape base part (1110) fixated on a structure (C) made of concrete or steel and wood, etc. of the bridge by a plurality of screw members (B); and a post installation part (1120) provided by protruding to a predefined length to an upper portion vertical to the base part in parallel. The post installation part (1120) comprises: a buoyancy operation vertical groove (1121) formed in a predefined length in a vertical direction; a post rotation guide groove (1122) formed in an arch shape on a top end of the buoyancy operation vertical groove; a restoration means fixating part (1123) provided to fixate one end of a spring of the restoration means; and a hinge means installation part (1124) to which the hinge means (1400) is engaged to rotationally install the post (1200).
申请公布号 KR20160069706(A) 申请公布日期 2016.06.17
申请号 KR20140175620 申请日期 2014.12.09
申请人 SIWOO CO., LTD. 发明人 KIM, KYU JONG
分类号 E01D19/10 主分类号 E01D19/10
代理机构 代理人
主权项
地址