发明名称 |
METHOD FOR CONSTRUCTING RAILROAD ELEVATED BRIDGE |
摘要 |
PURPOSE:To reduce the number of members and execute economical construction in a short term. CONSTITUTION:In a construction method wherein a longitudinal beam l to which a rail or a track skeleton is fixed directly is used, bridge piers 2 are erected on both sides of a track, and a crossing beam 3 to cross the track is fixed between the bridge piers 2 on both sides. The longitudinal beam 1 is fixed at the upper part of the cross beam 3 in parallel to the track. |
申请公布号 |
JPH0633404(A) |
申请公布日期 |
1994.02.08 |
申请号 |
JP19920212401 |
申请日期 |
1992.07.17 |
申请人 |
TOKYU CONSTR CO LTD |
发明人 |
TAMAI SHINICHI;NARIYUKI ATSUSHI |
分类号 |
E01B37/00;E01D1/00;E01D21/00;E01D101/26;E01D101/28;(IPC1-7):E01B37/00;E01D21/04;E01D7/02 |
主分类号 |
E01B37/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|