In order to produce a series of foundation elements in situ after the reinforcements (19) have been positioned, a mould (1), open at the bottom, is put in place around the reinforcements of a first element, a concrete designed to have stability of shape in a short time, of the order of a few minutes, is poured into this mould, the mould is removed when this time has elapsed, then the same mould is reused in the same way for each of the other elements of the said series. Application to the production of foundation blocks for posts or of cradles for a pipeline. <IMAGE>
|