摘要 |
<p>deck (38) extending across the gap (R) between the towers (30, 32) and cable stays (40, 42) fanning out from the top of each tower (30, 32) to separate longitudinally spaced load-bearing points (44) on the decks (38) such that a pair of cable stays (40, 42) extends from each load-bearing point (44) on the deck (38) to the tops of the respective towers (30, 32) with a span between towers (30, 32) 10 to 20 times tower height above the deck (38). <IMAGE></p> |