摘要 |
PURPOSE:To speedily correspondent to a complicated problem by obtaining a part (control slot) to designate a means for the control of a strategy executed result in an object which writes a purpose and an achievement course and means. CONSTITUTION:When a morning preparing goal is read as a next goal in a block (B) 3010, a strategy B1 is selected in order to achieve the morning preparing goal with a B3020. When the strategy B1 is an execution type, strategy execution B3040 is executed and a 'morning part schedule setting order' to be registered to the strategy B1 as an execution order is executed. The 'morning schedule setting order' executes the evaluation of a processed result when processing is finished. Then, a control means is selected according to an evaluated result and the name of the selected means is set to a control slot 57 of a strategy object 5. After that, the means is designated. When the means is designated to the control slot 57, defect control B3050 is executed. When the control can be executed B3070, it is executed. Then, when the control can not be executed, manual control B3060 is executed. |