摘要 |
PURPOSE:To move a traverser having a metal fittings inserting arm and a traverser having a product taking out arm on a track under sequence control in order to insert metal fittings into the mold of an injection molding machine. CONSTITUTION:An insert metal fittings inserting arm 18 is moved on a running rail 16 by an insert metal fittings inserting traverser 20 and stood by on a die cast machine 10. When the mold opening of a mold is confirmed, insert metal fittings are set by the insert metal fittings inserting arm 18 which is, in turn, retracted and upwardly extended during a mold clamping process. Subsequently, an insert metal fittings inserting traverser 20 moves to the position of a limit switch 24 and the insert metal fittings inserting arm 18 grasps the insert metal fittings. In the next step, the traverser 22 reachs the mold of the die cast machine 10 after the completion of mold opening to grasp and take out a cast product. |