摘要 |
There is disclosed a steam oven installation 10 comprising: a steam oven 12; a supply steam line 14 for receiving a superheated steam flow and for delivering supply steam to the steam oven; an injector 20 for injecting a volume of control fluid into the supply steam line 14; a monitor 44, 44' for monitoring at least one thermodynamic property of steam within the steam oven installation; and a controller 22 for controlling the injection of the control fluid based on the at least one monitored thermodynamic property so that the supply steam flow delivered into the steam oven comprises substantially dry saturated steam. There is also disclosed a corresponding method of controlling the supply of steam to a steam oven 12 in a steam oven installation 10. |