发明名称 Framställning av metaller från mineraler
摘要 <p>PCT No. PCT/AU93/00311 Sec. 371 Date Dec. 23, 1994 Sec. 102(e) Date Dec. 23, 1994 PCT Filed Jun. 25, 1993 PCT Pub. No. WO94/00606 PCT Pub. Date Jan. 6, 1994.A process for producing one or more metals from a mineral feedstock (12) is defined. The mineral is fed to a leaching apparatus (10) wherein it is contacted with electrolyte (14). The leaching apparatus has zones of decreasing oxidation potential (17, 18, 19, 20) respectively. A stream of electrolyte (14A) is removed from zone (20) and is treated to remove impurities and unwanted metals in treatment unit (25A), prior to metal recovery by electrolysis. The electrolyte after electrolysis is then returned to the leaching unit (10). A second electrolyte stream (14B) may be removed from zone (19) for recovery of additional metals. The electrolyte (14B) is treated to remove impurities and any unwanted metals in treatment unit (25B), prior to metal recovery by electrolysis. The electrolyte after electrolysis is returned to leaching unit (10). The process enables the leaching of difficult to leach minerals, including gold, and can produce one or more metals of high purity.</p>
申请公布号 FI946086(A0) 申请公布日期 1994.12.23
申请号 FI19940006086 申请日期 1994.12.23
申请人 INTEC PTY LTD. 发明人 EVERETT, PETER KENNETH
分类号 C22B3/04;B01D71/02;B01F7/16;B01F13/02;C01G3/00;C01G9/00;C01G21/00;C01G28/00;C01G29/00;C01G30/00;C01G49/00;C01G53/00;C22B;C22B3/00;C22B3/02;C22B3/06;C22B3/10;C22B3/44;C22B11/00;C22B13/00;C22B15/00;C22B19/00;C22B23/00;C22B30/02;C22B30/04;C22B30/06;C22B61/00;C25C1/00;C25C1/08;C25C1/12;C25C1/16;C25C1/18;C25C1/20;C25C7/00;C25C7/02;C25C7/04;(IPC1-7):C22B 主分类号 C22B3/04
代理机构 代理人
主权项
地址