摘要 |
The present invention relates to a process and reactor for the leaching of primary sulphide minerals, with systems to solve the problem of the passivation layer as well as methods for selective metal deposition on the cathode. The proposed invention provides a hydrometallurgy method for primary sulphide minerals that is faster than the pilot hydrometallurgy methods and industrially viable, entailing the possibility of replacing the conventional pyrometallurgy method. |