摘要 |
<p>PURPOSE:To find the work order of a good efficiency under various conditions easily and in a short time by providing a scheduling means which executes the decision of a work order based on the extraction result of a work in the maximum necessary time, the fore and aft relation of the work stage input by an input means and the arithmetic result of a necessary time calculating means. CONSTITUTION:In the work stage extracted by a maximum load stage extraction means M4, a maximum necessary time work extracting means M5, which extracts the body to be worked whose work necessary time becomes maximum is provided. Then, the decision of the work order is executed, by a scheduling means M6 based on the extraction result of this maximum necessary time work extraction means M15, the fore and aft relation of the work stage input by an input means M1 and the arithmetic result of a necessary time calculation means M2.</p> |