发明名称 Method for realizing maintenance operations i.e. replacement of heavier parts, of floating wind turbine device of off-shore wind energy production system, involves positioning floating wind turbine device on maintenance device
摘要 The method involves disconnecting a sinkable float (20) of anchor line systems (3a, 3b, 3c) and an electrical cable (40). A floating wind turbine device (1) is transferred from a production site to a maintenance device (5) by towing. The turbine device is positioned on the maintenance device, so that the turbine device is supported by the maintenance device. The maintenance device is fixed at the bottom (F) of a sub-marine. The turbine device is positioned on a lifting system (6) of the maintenance device. The turbine device is positioned above a movable immersed support (61). An independent claim is also included for a system for producing off-shore wind energy.
申请公布号 FR2970748(A1) 申请公布日期 2012.07.27
申请号 FR20110050437 申请日期 2011.01.20
申请人 NASS&WIND INDUSTRIE 发明人 BOURGOIN CYRIL
分类号 F03D1/00;B63B21/00;B63C1/00;F03D11/00 主分类号 F03D1/00
代理机构 代理人
主权项
地址