发明名称 METHOD OF OIL FIELD DEVELOPMENT
摘要 FIELD: oil and gas industry.SUBSTANCE: under this method the field is drilled according to row system with triangle grid of wells. Work agent is injected in the injection wells. Oil production is performed from production wells. At initial stage of the field development the production reservoir is presented by two horizons, if divided by central separating row of injecting wells with spacing between wells at least 300 m. Central separating row is arranged along line of maximum pay structure, the injection wells in it are made with opening by common filter of the both horizons. The closest first row of the production wells is drilled at distanced from the central row at least 500 m. Other areas of the reservoir are drilled with spacing between wells 300-400 m. After injection of the central row of the injection wells to 0.4-0.7 unit fractions of the pore volume to nearest rows of the production wells at least 90% wells of the central row are shutdown. After oil withdrawal at the entire field to 90% of initial oil productive capacity between the central separating row of the injection wells and nearest row of the production wells the sealing row of the production wells is drilled. Wells of the central row are switched to production at top horizon. During watering of the production wells of the first row to 98% they are switched to water injection.EFFECT: increased oil recovery factor of the field.2 ex, 2 dwg
申请公布号 RU2554971(C1) 申请公布日期 2015.07.10
申请号 RU20140134508 申请日期 2014.08.25
申请人 OTKRYTOE AKTSIONERNOE OBSHCHESTVO "TATNEFT'" IM. V.D.SHASHINA 发明人 KHISAMOV RAIS SALIKHOVICH;AKHMETGAREEV VADIM VALER'EVICH;RAFIKOV RINAT BILALOVICH;GAZIZOV ILGAM GARIFZJANOVICH
分类号 E21B43/20;E21B43/30 主分类号 E21B43/20
代理机构 代理人
主权项
地址