摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a pile structure which dispenses with drilling work and which can secure sufficient strength, and a method for constructing the same. <P>SOLUTION: In a pile structure 1, a plurality of piles 2 parallel to one another are connected together by means of connectors 3 and 4 buried in the ground, and two sockets 6 and 8 of each of the connectors 3 and 4 are connected to the two piles 2, respectively. Thus, strength sufficient for the pile structure is secured. Additionally, in construction, after the plurality of piles 2 are provided in the ground, the connectors 3 and 4 are buried in such a manner that the piles 2 penetrate the sockets 6 and 8, to dispense with drilling work. <P>COPYRIGHT: (C)2013,JPO&INPIT</p> |