摘要 |
PROBLEM TO BE SOLVED: To facilitate system construction and alteration in a large-scaled computer system constructed by using an integral device.SOLUTION: A management computer for managing a system holds configuration information in an integral device showing the configuration of the integral device, introduction predetermined integral device configuration information showing the configuration of an integral device having the possibility of being introduced to a computer system, and utilization ratio information representing contents of use of the integral device, acquires connectivity guarantee information showing whether connectivity between a computer and a storage device is guaranteed, selects an integral device to be introduced to the computer system with reference to the configuration information in the integral device, the introduction predetermined integral device configuration information, the connectivity guarantee information and the utilization ratio information, and outputs information about an integral device to be removed and the selected integral device to be introduced. |