摘要 |
<P>PROBLEM TO BE SOLVED: To provide a refrigeration cycle device capable of performing an efficient front-loaded operation while taking the capacity of a compressor into consideration. <P>SOLUTION: When performing a front-loaded operation, the refrigeration cycle device 100 determines the operation time of the front-loaded operation based on an operation frequency of the compressor 1 at the time when the efficiency of the refrigeration cycle is the maximum, the operation frequency being lower than the operation frequency of the compressor 1 at the time when the compressor 1 exerts its maximum capacity. <P>COPYRIGHT: (C)2013,JPO&INPIT |