发明名称 CONSTRUCTION METHOD OF STEEL COMPOSITE GIRDER BRIDGE
摘要 <p>The present invention relates to a construction method of a steel composite girder bridge, and more specifically, to a construction method of a steel composite girder bridge in which a non-composite section is kept on a cast-in-place slab when pre-stress is introduced, and non-shrinkage mortar is filled at the position of a shearing connector for serving as a composite section after the pre-stress is introduced. The construction method of a steel composite girder bridge according to the present invention comprises the steps of: mounting steel girders continuously formed with shearing connectors to be separated by a predetermined distance at pier sections; mounting shores and first forms to the steel girders for concrete slab casting; mounting non-composite members to the upper flanges of the steel girders at the non-composite sections of supports, and mounting second forms around the shearing connectors; forming support slabs by disposing sheath pipes to the supports and pouring and curing concrete, and forming shear pockets at the positions of the shearing connectors with the second forms; introducing pre-stress into support slab sections via the sheath pipes and carrying out grouting; forming span slabs by pouring and curing concrete to span sections between the pier sections and filling the non-shrinkage mortar into the shear pockets; and forming a road and mounting protection fences after removing the shores and the first and second forms.</p>
申请公布号 WO2011093556(A1) 申请公布日期 2011.08.04
申请号 WO2010KR03590 申请日期 2010.06.04
申请人 BYUN, HYUNG KYUN;LIM, MI YOUNG;PARK, MEON HWA;KIM, YONG JOO;KIM, JAE MIN 发明人 KIM, YONG JOO;KIM, JAE MIN
分类号 E01D2/00;E01D19/02;E01D21/00 主分类号 E01D2/00
代理机构 代理人
主权项
地址