发明名称 LAY-UP METHOD OF MAIN BOILER FOR LNG SHIP
摘要 A lay-up method of a main boiler for an LNG ship is provided to allow a lay-up for a long time by performing 4 times of boiler ignitions per two months as a short term lay-up and filling chemicals, nitrogen gas, and water as a long term lay-up to prevent a corrosion of the main boiler. A lay-up method of a main boiler for an LNG ship includes the steps of: removing moisture inside of the main boiler for lay-up of the main boiler for a long time; performing a short term lay-up to remove the moisture inside of the main boiler by igniting the main boiler during two months at an interval of 2 weeks for inspecting an operation; forming a magnetite protection layer by chemical processing a steam tank and a water tank for preventing the boiler from being corroded due to moisture of sea water for a long time; and constructing a long term lay-up to protect by filling nitrogen gas inside of a drum.
申请公布号 KR100852528(B1) 申请公布日期 2008.08.14
申请号 KR20070014127 申请日期 2007.02.12
申请人 DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD. 发明人 PARK, SANG HWAN
分类号 B63B25/16;B63B25/08 主分类号 B63B25/16
代理机构 代理人
主权项
地址