发明名称 PHASE MANAGEMENT METHOD AND PHASE MANAGEMENT PROGRAM
摘要 <P>PROBLEM TO BE SOLVED: To use an existing PC and software installed on the PC, and to properly manage a phase of a document. <P>SOLUTION: A server 22 transmits a document file to a predetermined user with the document file attached to an e-mail, together with a status management sheet described with a worker and working status. In a client machine, the attached document file is read by use of the existing software and entered into the document if necessary, and the working status inside the status management sheet is updated in response to input of the working status of the user. The server refers to the status management sheet attached to the sent-back e-mail, updates status of the document file inside a status management DB 38, specifies a worker in the next process, updates the worker inside the status management sheet, refers to a mail address DB 40, acquires the next worker, and transmits an e-mail to the next worker. <P>COPYRIGHT: (C)2004,JPO&NCIPI
申请公布号 JP2004192261(A) 申请公布日期 2004.07.08
申请号 JP20020358458 申请日期 2002.12.10
申请人 JAPAN RESEARCH INSTITUTE LTD 发明人 KADOTA KAZUTO;TERANISHI JUNKO
分类号 G06Q10/06;G06Q10/00;G06Q50/00 主分类号 G06Q10/06
代理机构 代理人
主权项
地址