摘要 |
<p>PROBLEM TO BE SOLVED: To eliminate a jam due to crossing of carrying routes. SOLUTION: A delivery port 46a of a first carrying route 46 is arranged lower than a carry-out port 47 of a second carrying route 47. With this structure, since a branch point, in which the first carrying route 46 and the second carrying route 47 cross each other, is eliminated, a member for switching these carrying routes is eliminated, and a jam easy to be generated in a conventional branch point can be eliminated. A movable plate 52 of an intermediate tray 53 is moved to a lower delivery position A and an upper carryout position B to excellently load sheet material P delivered from the delivery port 46a onto the intermediate tray 53, and the sheet material P on the intermediate tray 53 can be smoothly supplied to the carryout port 47a.</p> |