发明名称 DEEP WELL CONSTRUCTION METHOD USING EARTH RETAINING WALL
摘要 PROBLEM TO BE SOLVED: To reasonably construct a deep well together with an earth retaining wall by driving a well construction pipe as a part of an earth retaining wall forming pile while constructing the earth retaining wall, and achieving the excavation of the installation depth of a pump from the lower end of the well construction pipe. SOLUTION: In constructing the earth retaining wall in an open excavation work of an underground structure, the earth retaining wall 1 is constructed by inserting the well construction pipe 10 as a part of the pile in an earth retaining wall forming excavation hole (a pile hole 2) to be excavated to the predetermined depth, the excavation is further achieved from the lower end of the well construction pipe 11 to install the pump 19, and a pumping pipe 18 is arranged on the ground from the pump 19, and the deep well 10 is provided in the earth retaining wall 1.
申请公布号 JP2001115458(A) 申请公布日期 2001.04.24
申请号 JP19990294039 申请日期 1999.10.15
申请人 GEO-RESEARCH INSTITUTE;KUZUNO TSUNEO;TANAKA JUKI KENSETSU KK;OKIKO CORPORATION:KK;JAPAN FOUND ENG CO LTD 发明人 HASHIMOTO TADASHI;KUZUNO TSUNEO;TANAKA NOBUYUKI;ANDO YOSHIAKI;KATO SHIGENORI
分类号 E02D19/10;E02D3/10;E02D5/20;(IPC1-7):E02D19/10 主分类号 E02D19/10
代理机构 代理人
主权项
地址